SMC Construction Company (949) 916-3500
 
 
 

Anaheim Convention Center (ACC)
Location: Anaheim, CA
Owner: City of Anaheim
NTP: 21May07
Completion: December 7, 2007
Cost: $2,865,500.00
Architect: HOK
Project Description: Renovating the exterior area of the Arena structure to improve the aesthetics and provide natural lighting elements to the existing conditions; demolishing exterior walls and portions of the interior ceilings to install the new structural elements and adjusting the existing mechanical systems; installing new sloped aluminum glazing system with transparent vision glass; installing light control in concourse areas with motor controlled key operated shade system; restoring existing lighting, air ducting and signage. All work performed while the Convention Center remained fully function able.

Photos: